Software Testing and QA Interview Questions
This blog is for all sorts of Interview Questions with their answers for Software Testing and QA.
Monday, October 4, 2010
What are the entrance and exit criteria in the system test?
Entrance and exit criteria of each testing phase is written in the master test plan.
Enterence Criteria:
-
Integration exit criteria have been successfully met.
-
All installation documents are completed.
-
All shippable software has been successfully built
-
Syate, test plan is baselined by completing the walkthrough of the test plan.
-
Test environment should be setup.
-
All severity 1 MR’s of integration test phase should be closed.
Exit Criteria:
-
All the test cases in the test plan should be executed.
-
All MR’s/defects are either closed or deferred.
-
Regression testing cycle should be executed after closing the MR’s.
- All documents are reviewed, finilized and signed-off.
http://futurethoughtsllc.com/TestingandQA.aspx
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment